Solar PV & Electric Vehicle (EV) Infrastructure Development Across the Network
Project Overview
This programme focused on developing renewable energy and EV charging solutions across multiple rail locations. The initial solar PV installations at Shenstone, Perry Barr and Northampton stations demonstrated the viability of solar generation and created a foundation for wider rollout opportunities across the estate.
Building on this success, additional solar and EV integration studies, funding proposals and concept designs were developed across the network.
RPS Role
Over the last four years, RPS Project Manager Asish has played a key strategic and delivery role, working closely with the client’s property and Energy teams as well as the Department for Transport.
His involvement included:
Strategic & Funding Support
Drafting multiple funding and investment reports to support solar and EV deployment
Preparing submissions for funding opportunities including:
IRG / IRGI funding applications
CAPEX panel and investment board submissions
Supporting business case development, feasibility studies and option selection
Providing cost modelling, programme inputs and technical justification for funding approval
Technical & Delivery Expertise
Beyond project coordination, RPS provided strong technical input to ensure solutions were viable, compliant and future-proof.
Key technical contributions included:
Energy demand assessments and solar generation modelling
PV system sizing and battery storage considerations
Grid connection and infrastructure interface reviews
Integration planning between solar generation and EV charging infrastructure
This combination of commercial, programme and technical capability enabled informed decision-making and accelerated approvals.
Solution Options Developed
Across multiple sites, we explored and developed practical deployment options such as:
1. Rooftop Solar with EV Charging
Direct PV installation on station and depot rooftops
Solar generation used to offset building demand and support EV charging infrastructure
Suitable for sites with strong roof capacity and daytime energy use
2. Solar Carports Integrated with EV Charging
Solar canopies installed over car parks
Generation linked to EV charging points and station demand
Dual benefit of renewable energy production and sheltered parking
These options supported scalable deployment and aligned with estate constraints, energy demand and operational needs.
Key Outcomes & Value Added
Strengthened renewable energy roadmap across the network
Successful funding submissions supporting investment decisions
Integration of solar generation and EV infrastructure concepts
Improved stakeholder alignment between client teams, suppliers and funding bodies
Demonstrated ability to combine technical understanding with programme delivery
Why This Matters
This programme highlights RPS capability to:
Support early-stage strategy, feasibility and funding
Deliver technically robust renewable energy solutions
Integrate solar and EV infrastructure effectively
Provide long-term support and asset optimisation